3 Opening(s)
2.0 Year(s) To 3.0 Year(s)
Not Disclosed by Recruiter
JD :
Install and lay power cables (copper & aluminium) in trench, ducts, and cable trays.
Modify and replace SFU/MCCB panels (32A–800A).
Troubleshoot DOL & Star-Delta starters (2HP–40HP).
Install earthing strips and complete proper grounding work.
Perform wiring, conduit installation, cable dressing, and fixing of switch sockets (domestic & industrial).
Carry out preventive maintenance of MCC ...