5 Opening(s)
2.0 Year(s) To 10.0 Year(s)
Not Disclosed by Recruiter
Job Location: Pune Job Description:
Job Title: Field Technician Qualification: H.S.C / ITI / Diploma Experience : 2-8 Years (Elevator Industry) Salary details - Best in the industry (It will be on Talisman HR Payroll)
Other Benefits - PF / ESIC & Self Insurance Work timing - 9 hours Work Days - ...
3 Opening(s)
2.0 Year(s) To 3.0 Year(s)
Not Disclosed by Recruiter
JD :
Install and lay power cables (copper & aluminium) in trench, ducts, and cable trays.
Modify and replace SFU/MCCB panels (32A–800A).
Troubleshoot DOL & Star-Delta starters (2HP–40HP).
Install earthing strips and complete proper grounding work.
Perform wiring, conduit installation, cable dressing, and fixing of switch sockets (domestic & industrial).
Carry out preventive maintenance of MCC ...
1 Opening(s)
20.0 Year(s) To 25.0 Year(s)
Not Disclosed by Recruiter
•Site Supervision & Execution: Oversee daily installation activities for HVAC, electrical power, fire fighting, and plumbing systems.
•Coordination & Planning: Coordinate with structural, architectural, and other MEP trades to resolve conflicts (clash detection) and ensure seamless integration.
•Technical Compliance: Ensure all installations adhere to project specifications, local building codes, and safety standards.
•Quality ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
Not Disclosed by Recruiter
Position: CAD / Working Drawings Executive
Department: Design & Production Location: Byculla West Reporting To: Technical Head / Project Manager
Key Responsibilities
Prepare detailed shop drawings, working plans, schematics, and elevations for the costing and production departments.
Develop accurate and comprehensive detail drawings as per project requirements across interior, exhibition stand, and retail environments to ensure seamless production and execution.
Create detailed BOQs (Bill of Quantities) for ...
50 Opening(s)
0 To 8.0 Year(s)
Not Disclosed by Recruiter
Job Description - • Ensure the safety, discipline and culture of the organization is maintained. • Erection of lifts referring to the approved layouts.• Template preparation.• Mechanical completion• Cabling and all wiring related works• Mechanical adjustments.• Clearance of all stages of the in-process check chart in 1st inspections.• Audit rating ...